Skip to content
  • About Us
  • Benetti
  • Brokerage
  • Charter
  • REFIT & REPAIRS
  • About Us
  • Benetti
  • Brokerage
  • Charter
  • REFIT & REPAIRS
  • AGENCY SERVICES
  • Contact
  • AGENCY SERVICES
  • Contact
LIST MY BOAT
Contact Us
SEND MY CV
Send you CV

Maximum file size: 10MB

Gino Group
  • Home
  • Brokerage
  • About Us
  • Benetti
  • AGENCY SERVICES
  • REFIT & REPAIRS
  • Contact
  • Home
  • Brokerage
  • About Us
  • Benetti
  • AGENCY SERVICES
  • REFIT & REPAIRS
  • Contact
LIST MY BOAT
SEND MY CV
  • Home
  • Yachts
  • Brokerage
  • Humphreys 40

Humphreys 40

SA7373

€ 75,000

Type Sailing
Length Overall (LOA)
12.1 m
Beam
3.47 m
Draft
Built Year
1992
Flag
Polish
Hull Material
Deck Material
Notes
Our yacht is a custom-built racing boat with no comparable equivalent. All maintenance has been carried out by the Gino Group Technical Service team, ensuring the boat is in excellent condition. The engine has been overhauled. The antifouling was applied in August 2025. The deck was repainted in June 2025 with white sand-textured paint, and the hull was also repainted in 2024. The boom was serviced and rig tuning was completed in July 2025. The toilet and faucets are fully functional.
DOWNLOAD DECK
CONTACT US FOR INFORMATION
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
  • Home
  • Yachts
  • Brokarage

Humphreys 40

SA7373

SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
SA7373
DOWNLOAD DECK
CONTACT US FOR INFORMATION
Type Sailing
Length Overall (LOA)
12.1 m
Beam
3.47 m
Draft
Built Year
1992
Flag
Polish
Hull Material
Deck Material
Notes
Our yacht is a custom-built racing boat with no comparable equivalent. All maintenance has been carried out by the Gino Group Technical Service team, ensuring the boat is in excellent condition. The engine has been overhauled. The antifouling was applied in August 2025. The deck was repainted in June 2025 with white sand-textured paint, and the hull was also repainted in 2024. The boom was serviced and rig tuning was completed in July 2025. The toilet and faucets are fully functional.
Specifications
Tankage
Engine & Machinery
Deck & Safety
Navigation & Electronics
Galley
Accommodation
Sails
SailsMainsail (2022), Overlapping Genoa (2022), Jib (2025), Asymmetric Spinnaker (2023), Symmetric Spinnaker (2025)
Main Sail2022 by UK Sails
Spinnaker EquipmentAsymmetric Spinnaker (2023), Symmetric Spinnaker (2025
OthersThe boom was serviced in June 2025. The rig tuning was completed in 2025.

Back to top

İSTANBUL ÇANAKKALE KUŞADASI BODRUM MARMARİS GÖÇEK ANTALYA

Gino Group. All right reserved. © 2025    Privacy Policy